Dear Gurus,
I have done the following configuration, and at the end having subjected issue.
- MC21 create a info structure with reference to S076, and change the Characteristic to (Plant+Material) and Key Figure to (Sale+Net Price+Net Value).
- In MC7F I have change the planning method to Level by level Planning, and maintain the statistical currency USD and base unit of measure to PC.
- In MC8A create a profile (Planning Type) Z001 with the above newly generated info structure ZS01. But when I goes in the main screen I call the Structure (Sale+Net Price+Net Value), and leave blank in all the values.
- In MC93 while I will enter the Planning type Z001, so in next screen I seen the field Plant+material, when I enter the values in it and press enter system give me the following message.
Structure not yet maintained for this combination of characteristics
Message no. MA361
Please suggest what mistake I have done, plus is it necessary to enter some values in MC8A please elaborate with example, I am stuck here in this position.
Looking for the gurus feedback.
Regards,